Monday, 4 March 2013

Bricks - Almost done, Truss fixed, Front Door


The bricklayers have almost finished. They have finished brickwork in the alfresco including the ledge for the bottom of the sliding stacking door, the alfresco piers and the front window ledges.

The truss company has been out to fix the gutter truss that they decided to fix by previously by making the below wall load bearing. They have cut up the truss and laminated new timber next to it. They have used some fairly large bolts and metal plates so hopefully there will be no issues with the way its fixed.

The fixing carpenter has also visited today and has finished shimming out and planning the walls in the Garage / Lounge wall, he even ripped the insulation in the process so hopefully this gets fixed up correctly.

The front door was also installed today. The front of the house now really stands out with this new door installed. I can't wait to see it finished with the stain added.

Tomorrow I expect that the brick layers will be finished.

Front Facade - Bricking Complete - Notice the difference in colour in the mortar on the left side of the Garage

Window ledges have been added

Portico finished up

Brick work and ledge under windows completed for Study / Family windows

Alfresco Pier done. I'm glad we moved the water points to the same side as the Gas point

Alfresco / Family room Door. Notice is not actually there?

Alfresco is looking good.

Whats going on here, recycled and mains joined at side of the house? Shouldn't it be joined at the taps?

The Garage wall has been shimmed and one of the studs planned back.

Notice the insulation ripped open where the carpenter planned the wal..

Repair work done on the gurder truss. Notice the extra wood laminated.

Here is an obvious cut

If you look carefully you can see the cuts on the original truss work

Truss has packing added and next beam has wood laminated to create straight edge.

Notice the wall below is no longer load bearing.

Tuesday, 22 January 2013

Frame Stage Complete - Fascia Installed

Frame Stage Complete.


Today we received our Invoice for the Frame, which I find a little unfair as they still have frame issues to resolve but based on our contracts we are only allowed to hold the last progress payment. So I quickly organised for the payment to be made.

Fascias Installed


Today the house had all the fascias and gutters installed.



Front Facade

Front / Master Bed Side, Bed2, Laundry, Bath, Bed3

Closeup of Master Bed

East Side, Ensuite, Bed2 Laundry, Bath, Bed3

Alfresco, Family, Study, Lounge

Alfesco, Family Study Lounge

Front / Garage

Alfresco / Games / Family

Alfresco Games, Family & Study


Monday, 21 January 2013

First Site Meeting with SS

I had my first Site Meeting with our SS today on his first day back after 5 weeks! I wanted to make sure that I raised issues as early as possible to ensure that items are fixed before either tradies have left or the next stage of the build advances too far.

We have a few issues that we have picked up over the last week from the Frame. I picked up more each time I went as I got more focused and less clouded by my excitement. Interesting lesson there I think...

So anyway I raised the following issues with my SS, most of which he agreed and either marked down or said he will follow up or will be fixed in a later stage of the build.

We also discussed the timing and he said he will get the repairs organised and also he has to organise his own Inspection of the Frame/Slab. When asked if Wednesday was still okay to let our Inspector come down and he said that it would be okay and that some of the items may not be fixed but not to worry and book the inspection in anyway.

We discussed future timings of the build:

Tomorrow:   Fascias Installed
Wednesday: Safety Rails on the Roof Installed.
Thursday:     Roof Start
Friday:         Roof Finished

Next week sometime: Plumbing
Next week sometime: House Wrap
Middle of  Feb:          Bricks

And Electrical in 4 weeks or so? Sh*t! I better finish planning my C-Bus Electrical System.


Outstanding issues in Order of Importance:

* Sliding Door - Chip on paint showing bare metal size of 20cent piece. Requires Replacing.
  He will raise it to the Window supplier to "fix", when asked if it will be replaced he replied he was not sure.
* Framing - Ensuite Stud Centers not at 300mm spacing for full tiled wall.
  He agreed and marked on the timber for the Carpenter to install more studs.
* Framing - Theatre Room Wall built as Load Bearing.
  He discussed that the plans show it was not load bearing, but believes the carpenter did it because of our inset ceiling and that its has better support. He then said that he will get him to fix it.
* Framing - Toilet Doorway Framing Completely Split. Requires Replacing
  He did not seem too concern about the split framing and said it seemed solid. Not to worried myself.
* Framing - Garage Framing Overhangs (Completed, but is this acceptable?)
  Showed him the solution, and he was not to concerned. I'll also get the Building Inspector to have a look at this one.
* Framing - Roof Trusses not secured down on Family wall.
 His response was the the Roof Truss will settle on the frame once the roof has been installed (will check this again)
* Framing - Large Knots in the Wood Frame in the Lounge Ceiling
 We both agreed this is non structural and only for a small section of plaster support.
* Framing - Kitchen Splintered Stud in Load Bearing Wall
 He marked the stud and said that it will be fixed by sistering another piece of timber next to it.
* Framing - Laundry Door Way to Hallway Loose
 He marked the timber frame to have additional nails to the floor for the carpenter.
* Framing - Bed2 Doorway Not secured to Floor or Frame
 He marked the frame with the comment "fix"
* Framing - Fridge Spacing Framing Lose. Requires additional Nailing to Floor
 He marked the frame with the comment "fix"
* Windows - Lounge Window Spacers not installed correctly, Bottom Support Bent.
 He said this will be fixed later by Brick Layers and was not to concerned (I''ll see what the building inspector says"
* Doors - Family to Alfresco Stacker not installed level on Top Left of Frame.
 He seems to think this was not an issue. Not to worried yet as I'm hoping they replace the frame anyway and fix it then.
* Concrete slab - Rear section of the building blow out.
 He agreed, and while we were there the slab guys were there for another site which he then showed them (cool)
* Plumbing - Toilet Plumbing not centered
 He was not worried, said the plumbers will just move it over buy jacking up some of the concrete.
* Master Bedroom WIR - Tiber not straight, will make plaster difficult.
 He wrote a question mark on the timber for the Carpenter. he also said that the fixing guys will make sure its straight.

Thursday, 17 January 2013

Frame - Roof Continued

We visited the site again today not expecting to much due to the extremely hot weather (40°C). Our Portico Roof has been completed, the Valleys where the Roof meet have been installed. A lot of metal cross bracing support has been added to the Roof and Walls. The Internal Walls have been tied to the Roof Trusses and Noggins are being installed around the Theater Ceiling.

The issue with the overhang of the Garage Frame has been fixed. The solution the carpenter used was to block underneath the Frame with Treated Pine Blocks. One side of the Garage Frame this seams fairly sturdy, on the other side I'm not convinced of its value. I'll show the Building Inspector and see what he thinks next week.

I've emailed the issue about the Load Bearing wall issue with the Theater Room off to the BC today and she has sent this off to the SS. When visiting today I haven't seen any rectification of the Wall but I'd imagine the carpenter left when it got to hot around lunch time today.



Front Facade - Portico Completed

Front Facade - Portico Completed, Roof Valleys added

Looking at Roof Valleys on Alfresco

Portico Completed

Solution to the Frame overhang?

Solution to the Frame overhang?

Wednesday, 16 January 2013

Frame - Roof

We have a roof frame!

90% of our Roof was completed today with the only the Portico section not completed. What a change this makes to seeing just wall frames, now it is really looking like a house and not just a slab with bits of wood sticking out of it.

We were really happy to get a sense of what our 2590mm ceilings look like, I'm even happier that I can't touch the ceiling being 6'3". The Theater Ceiling (Lounge) is raised an extra 300mm higher and really makes the room look much bigger.

I have picked up two issue thou, the Theater Wall next to the Kitchen is supposed to be non load bearing, but the carpenter has made it load bearing. The roof trusses were designed not to require this wall being load bearing. This isn't an issue right now, but if for any reason we wanted to pull down the wall or move it we can't as the house will move slightly potentially cracking plaster. Email of to SS/BC tomorrow for this one.

The framing in the Garage hangs over the slab by about 40mm, I believe it is allowed to be no longer than 10mm. I'll wait and see if he fixes this up or I'll leave it for my Building Inspector to raise.

Our Window Frames were all delivered today and I was happy to see that everyone of them is Double Glazed and confirmed this from seeing the DGU comment on the sticker of the window frame especially after reading of another persons issue in the homeone forums who was supposed to get double glazed but had singled glazed units installed.

One of the Window Frames has a large chip on the paint that has exposed the bare metal on it about the size of a 20cent piece. I'll see if they replace this if not I'll raise it.


House Facade (Bellford) with 350mm eaves all round except Garage side

Front / East side of house

East Side of House

Rear / East Side of House

Alfresco, Rear / West Side of House

West Side of House, Lounge / Study

Garage with 0mm lot finish

Family looking towards Kitchen/Pantry

Pantry looking towards Family/Alfresco

Theater (Lounge) Raise Inset 300mm Ceiling

Near Master Bed WIR looking toawards Ensuite

Our Double Glazed Windows, Stacking Doors and Sliding Doors

More Double Glazed Windows


Tuesday, 15 January 2013

Frame - Walls


Walls up!

What an exciting day today. When we were driving down the main street we could see that all the walls of the house were up. We also noticed that all the Roof Trusses were delivered with the larger trusses sitting on the frame ready to be installed tomorrow from the looks of it.

With the rest of the frames up we spent a lot of time walking around getting an idea of room sizes and taking lots of photos. I was also looking carefully at framing thinking about how the future C-Bus system controlls and extra power points were going to be installed as we are doing these post handover while I was doing this my wife was busy taking photos of our DD in the house :)

The house just seems so big right now. I'm not sure if its just a BIG house or a bit of an illusion from not having plaster on the walls, but I'm really happy with the size of the Theater room (lounge), Kitchen, Games and Family areas.


Front Elevation. Garge / Master Bed WIR

Alfresco, Family, Study, Theatre & Garage (West Side)

Master Bed, Ensuite, Bed2, Laundry, Bed3, Bed4

Master Bed & WIR Front Elevation

Looking down side/back of house. Bed4 / Games closest

Standing just inside the alfresco door looking towards kitchen. Study is on the right side

Kitchen and Theater room (Lounge)

Bed4 WIR, also seen is Bed3 WIR

Study and Study Store (AKA Media & Network Cabinet)

Theater Room (Lounge)

Theater Room (Lounge) looking towards Kitchen