This morning we went down and visited the site supervisor who wanted to run through the various items that were raised in the pre-plaster inspection report and show us what items have been resolved and what items also still needs to be fixed up.
While we were on site he quickly fixed up the noggins for the ensuite bath, bathroom bath, and meter box. He advised that the plumber will be around in the next week or two to fix the drainage points for the ensuite toilet and garage sink, but he is not to worried as this can be done at any stage. We spoke about the concrete with the dusting surface that he doesn't think is dusting but said they will run a coat of bondcrete over the surface anyway.
The other item that hasn't been fixed is the sag in the ceiling to Games, Bed4, Bed3 and hallway outside of Bed3. He said he will fix this up on Tuesday, so I'll be keeping an eye to make sure each of them is in fact fixed as I will be very annoyed if they plaster with out fixing it as it will stand out like a sore thumb.
I asked what are the next upcoming items are he said that plaster should be next Wednesday depending on their availability they usually require 4 days notice. He also said that they will get the base coat of render done on the front projection, get the casement mouldings put around the master bedroom and WIR windows, and that the bricks will get acid washed.
We spoke about the off colour mortar and he said that they can get a special company in that can colour correct the mortar but he will wait to see how it looks after the bricks are washed.
He also said that once the plaster is done that the Kitchen cabinets will be in and that should all happen before the end of the month.
We had a chat about the ongoing issue with the stacking sliding door to the alfresco/family room that is currently off site being repaired and the SS has said that it is holding him up being able to put the house in lockup stage and that he may have to just board up the wall as his boss is getting upset that its not at lockup stage yet. Well maybe if the fixed the sliding door the first time and fixed the house frame issues when they were raised we would be weeks ahead now.
Anyway we are really looking forward to seeing the plaster going up next week. I recon this is the most exciting moment after the frame first going up. We will finally get some real depth to the rooms.
Showing posts with label Site Meeting. Show all posts
Showing posts with label Site Meeting. Show all posts
Friday, 8 March 2013
Monday, 21 January 2013
First Site Meeting with SS
I had my first Site Meeting with our SS today on his first day back after 5 weeks! I wanted to make sure that I raised issues as early as possible to ensure that items are fixed before either tradies have left or the next stage of the build advances too far.
We have a few issues that we have picked up over the last week from the Frame. I picked up more each time I went as I got more focused and less clouded by my excitement. Interesting lesson there I think...
So anyway I raised the following issues with my SS, most of which he agreed and either marked down or said he will follow up or will be fixed in a later stage of the build.
We also discussed the timing and he said he will get the repairs organised and also he has to organise his own Inspection of the Frame/Slab. When asked if Wednesday was still okay to let our Inspector come down and he said that it would be okay and that some of the items may not be fixed but not to worry and book the inspection in anyway.
We discussed future timings of the build:
Tomorrow: Fascias Installed
Wednesday: Safety Rails on the Roof Installed.
Thursday: Roof Start
Friday: Roof Finished
Next week sometime: Plumbing
Next week sometime: House Wrap
Middle of Feb: Bricks
And Electrical in 4 weeks or so? Sh*t! I better finish planning my C-Bus Electrical System.
Outstanding issues in Order of Importance:
* Sliding Door - Chip on paint showing bare metal size of 20cent piece. Requires Replacing.
He will raise it to the Window supplier to "fix", when asked if it will be replaced he replied he was not sure.
* Framing - Ensuite Stud Centers not at 300mm spacing for full tiled wall.
He agreed and marked on the timber for the Carpenter to install more studs.
* Framing - Theatre Room Wall built as Load Bearing.
He discussed that the plans show it was not load bearing, but believes the carpenter did it because of our inset ceiling and that its has better support. He then said that he will get him to fix it.
* Framing - Toilet Doorway Framing Completely Split. Requires Replacing
He did not seem too concern about the split framing and said it seemed solid. Not to worried myself.
*Framing - Garage Framing Overhangs (Completed, but is this acceptable?)
Showed him the solution, and he was not to concerned. I'll also get the Building Inspector to have a look at this one.
* Framing - Roof Trusses not secured down on Family wall.
His response was the the Roof Truss will settle on the frame once the roof has been installed (will check this again)
* Framing - Large Knots in the Wood Frame in the Lounge Ceiling
We both agreed this is non structural and only for a small section of plaster support.
* Framing - Kitchen Splintered Stud in Load Bearing Wall
He marked the stud and said that it will be fixed by sistering another piece of timber next to it.
* Framing - Laundry Door Way to Hallway Loose
He marked the timber frame to have additional nails to the floor for the carpenter.
* Framing - Bed2 Doorway Not secured to Floor or Frame
He marked the frame with the comment "fix"
* Framing - Fridge Spacing Framing Lose. Requires additional Nailing to Floor
He marked the frame with the comment "fix"
* Windows - Lounge Window Spacers not installed correctly, Bottom Support Bent.
He said this will be fixed later by Brick Layers and was not to concerned (I''ll see what the building inspector says"
* Doors - Family to Alfresco Stacker not installed level on Top Left of Frame.
He seems to think this was not an issue. Not to worried yet as I'm hoping they replace the frame anyway and fix it then.
* Concrete slab - Rear section of the building blow out.
He agreed, and while we were there the slab guys were there for another site which he then showed them (cool)
* Plumbing - Toilet Plumbing not centered
He was not worried, said the plumbers will just move it over buy jacking up some of the concrete.
* Master Bedroom WIR - Tiber not straight, will make plaster difficult.
He wrote a question mark on the timber for the Carpenter. he also said that the fixing guys will make sure its straight.
We have a few issues that we have picked up over the last week from the Frame. I picked up more each time I went as I got more focused and less clouded by my excitement. Interesting lesson there I think...
So anyway I raised the following issues with my SS, most of which he agreed and either marked down or said he will follow up or will be fixed in a later stage of the build.
We also discussed the timing and he said he will get the repairs organised and also he has to organise his own Inspection of the Frame/Slab. When asked if Wednesday was still okay to let our Inspector come down and he said that it would be okay and that some of the items may not be fixed but not to worry and book the inspection in anyway.
We discussed future timings of the build:
Tomorrow: Fascias Installed
Wednesday: Safety Rails on the Roof Installed.
Thursday: Roof Start
Friday: Roof Finished
Next week sometime: Plumbing
Next week sometime: House Wrap
Middle of Feb: Bricks
And Electrical in 4 weeks or so? Sh*t! I better finish planning my C-Bus Electrical System.
Outstanding issues in Order of Importance:
* Sliding Door - Chip on paint showing bare metal size of 20cent piece. Requires Replacing.
He will raise it to the Window supplier to "fix", when asked if it will be replaced he replied he was not sure.
* Framing - Ensuite Stud Centers not at 300mm spacing for full tiled wall.
He agreed and marked on the timber for the Carpenter to install more studs.
* Framing - Theatre Room Wall built as Load Bearing.
He discussed that the plans show it was not load bearing, but believes the carpenter did it because of our inset ceiling and that its has better support. He then said that he will get him to fix it.
* Framing - Toilet Doorway Framing Completely Split. Requires Replacing
He did not seem too concern about the split framing and said it seemed solid. Not to worried myself.
*
Showed him the solution, and he was not to concerned. I'll also get the Building Inspector to have a look at this one.
* Framing - Roof Trusses not secured down on Family wall.
His response was the the Roof Truss will settle on the frame once the roof has been installed (will check this again)
* Framing - Large Knots in the Wood Frame in the Lounge Ceiling
We both agreed this is non structural and only for a small section of plaster support.
* Framing - Kitchen Splintered Stud in Load Bearing Wall
He marked the stud and said that it will be fixed by sistering another piece of timber next to it.
* Framing - Laundry Door Way to Hallway Loose
He marked the timber frame to have additional nails to the floor for the carpenter.
* Framing - Bed2 Doorway Not secured to Floor or Frame
He marked the frame with the comment "fix"
* Framing - Fridge Spacing Framing Lose. Requires additional Nailing to Floor
He marked the frame with the comment "fix"
* Windows - Lounge Window Spacers not installed correctly, Bottom Support Bent.
He said this will be fixed later by Brick Layers and was not to concerned (I''ll see what the building inspector says"
* Doors - Family to Alfresco Stacker not installed level on Top Left of Frame.
He seems to think this was not an issue. Not to worried yet as I'm hoping they replace the frame anyway and fix it then.
* Concrete slab - Rear section of the building blow out.
He agreed, and while we were there the slab guys were there for another site which he then showed them (cool)
* Plumbing - Toilet Plumbing not centered
He was not worried, said the plumbers will just move it over buy jacking up some of the concrete.
* Master Bedroom WIR - Tiber not straight, will make plaster difficult.
He wrote a question mark on the timber for the Carpenter. he also said that the fixing guys will make sure its straight.